Sabirabad city “Water supply and sewage system reconstruction” project concerns installation of 1676m of main pipeline, 149621.2 m of the water network, 124531 m of sewage network and 9866 m of sewage collectors. In addition, a 5000 m3 water storage reservoir and two Waste Water Treatment facilities with 77760 m3/day output will also be built in the region. These facilities are designed for treatment of wastewater in the cities of Sabirabad and Saatli and in nearby villages.
Most of the works planned in Sabirabad city, including the construction of water network, main water line, and water reservoir building are nearing completion.
The realization of the project will ensure 24/7 potable water supply to 32600 persons.