6 artesian wells were excavated for the drinking water supply of Agstafa, along with 2 water reservoirs with capacities of 1000 m3 and 1500m3, a water network of 164521.5 meters, and a sewerage network with a length of 139688 m. Additionally, a waste water treatment plant (with a capacity of 4900 m3/day), administrative buildings, laboratory buildings and other ancillary buildings were built and put into operation. Realization of this project will provide 28,000 people with drinking water 24 hours a day.