Employer: Ministry of Transport of Azerbaijan
Main Podrate: AKKORD ICIC OJSC
Sub Podrate: REAL INSHAAT LLC
Project operations commenced in November 2007 Completed in May 2008
Length: 17 km
Width: 29.5 m
Concrete density: 26-30 cm T
he first concrete road in Azerbaijan. The road consists of 6 traffic lanes (the width of each lane is 3.75 m). 4 pedestrian crossings and 2 bridges were built at the intersection of the road.