Provision of potable water to Tovuz city includes the drilling of 7 sub-artesian wells, construction of a water reservoir consisting of two 2500 m3 and two 200 m3 water tanks, and installation of 232377.3 m of water network and 213316.4 m of sewage network. Construction is complete of a Waste Water Treatment Facility with an output of 3400 m3/day as well as an administrative building, a laboratory and other auxiliary buildings.
The realization of the project will ensure a 24/7 portable water supply to 43,000 persons.